news center
Check category
/
/
/
Installation skills of Monorail hoist for lifting
Installation skills of Monorail hoist for lifting
分类:Monorail Hoist News 时间: 2022-03-19 08:33
【摘要】
Monorail hoist for lifting

Installation skills of Monorail hoist for lifting:

First, the monorail hoist box needs to be installed.
Second, connect the power cord.
When connecting the power cord, the power must be cut off in advance. At the same time, the ground wire should be well grounded, otherwise the operator may feel electric shock when touching any part of the Monorail hoist for lifting or chain.
Third, lubricate the load chain of the Monorail hoist for lifting.
The degree of lubrication of the Monorail hoist for lifting chain is an important factor affecting the service life of the load chain. Timely and effective lubrication of the load chain can ensure the effective service life of the chain.

Installation skills of Monorail hoist for lifting
Fourth, check the alignment of the chain.
For Monorail hoist for lifting with multi-line chains, make sure that the lower hook frame is not turned over. If flipped, return it to its normal state, making sure the welded joints of the chain line up. Never hang a load on a Monorail hoist for lifting with a twisted chain.
Finally, check the operating voltage.
Since the Monorail hoist for lifting is equipped with the voltage specified by the user or a higher voltage (only for dual voltage) when leaving the factory, such as 230/460V, it is necessary to check the wiring and confirm whether it meets the requirements of the power supply voltage. If not, please refer to the manual to correct it to meet the necessary working voltage requirements

logo

zhejiangshuangniao lifting equipment co.,ltd.

With the core concept of "innovation to lead the future, focus on achievement", we have become the vane of domestic electric hoist development and lead the development of domestic electric hoist industry.

Group Industry

Zhejiang Shuangniao Machinery Co., Ltd.
Zhejiang Shuangniao Lifting Equipment Co., Ltd.
Zhejiang Double Bird Anchor Chain Co., Ltd.
Zhejiang Shuangniao Digital Machine Tool Co., Ltd.

Contact Us

Address: No. 9, Tenglong Road, Industrial Function Zone, Huangze Town, Shengzhou City, Zhejiang Province
Phone:
0575-83051888

Telephone:18957539688(Mr.Liu)18957536588(Mr.Wei)
After sale:0575-83501776
Fax:0575-83505818
Web:
www.tbmcrane.com
E-mail : info@tbmhoist.com

 

follow us

Follow the website

follow us

Official account

© 2020 Zhejiang Shuangniao Lifting Equipment Co., Ltd. All rights reserved  浙ICP备2020035933号-1

Power By:300.cn