Safety precautions when working with lifting equipment from China manufacturer:
1. When lifting heavy objects, try lifting first, slowly lift the hook, stop for a while when the heavy objects are 50cm above the ground, and continue to lift after the heavy objects are stable.
2. During the lifting and lowering of the lifting equipment from China manufacturer, it is strictly forbidden to suddenly speed up or slow down or brake suddenly. The left and right rotation should be stable, and the reverse movement should not be performed before the rotation is stopped.
3. Lifting and hanging objects are strictly prohibited from falling freely, and the handbrake or footbrake should be used to control the lowering slowly.
4. When two tower cranes work at the same time, the distance between the two cranes and the hanging objects shall not be less than 5m.
5. When the tower crane is operating, it is strictly forbidden for anyone to stay or pass under the boom and heavy objects.
6. It is strictly forbidden to lift heavy objects and hang them in the air for a long time.
7. It is strictly forbidden to use lifting equipment from China manufacturer to lift personnel.

lifting equipment from China manufacturer
8. Lifting equipment from China manufacturer should be suspended in case of strong winds or heavy rains above level 6. After the strong winds and rains, a comprehensive inspection (track and tower crane) should be carried out to confirm safety before operation.
9. If an abnormality is found during operation, it should be shut down for maintenance. During maintenance, the gate should be opened, the box should be locked, and a warning sign of "Someone is working, closing is prohibited" should be hung or a guardian should be set up. The walking tower crane should lock the rail clamp.
10. During the operation of the lifting equipment from China manufacturer, when the operator temporarily leaves the operating room, the power must be cut off and the rail clamp should be locked.
11. After the operation is completed, the tower crane should be parked in the middle of the track, the boom should be turned to the downwind direction, and the slewing brake should be released, and the hook should be raised to 2-3m from the top of the boom.

logo

zhejiangshuangniao lifting equipment co.,ltd.

With the core concept of "innovation to lead the future, focus on achievement", we have become the vane of domestic electric hoist development and lead the development of domestic electric hoist industry.

Group Industry

Zhejiang Shuangniao Machinery Co., Ltd.
Zhejiang Shuangniao Lifting Equipment Co., Ltd.
Zhejiang Double Bird Anchor Chain Co., Ltd.
Zhejiang Shuangniao Digital Machine Tool Co., Ltd.

Contact Us

Address: No. 9, Tenglong Road, Industrial Function Zone, Huangze Town, Shengzhou City, Zhejiang Province
Phone:
0575-83051888

Telephone:18957539688(Mr.Liu)18957536588(Mr.Wei)
After sale:0575-83501776
Fax:0575-83505818
Web:
www.tbmcrane.com
E-mail : info@tbmhoist.com

 

follow us

Follow the website

follow us

Official account

© 2020 Zhejiang Shuangniao Lifting Equipment Co., Ltd. All rights reserved  浙ICP备2020035933号-1

Power By:300.cn